Planning Events
Temporary Structures
Many events require temporary demountable
structures. These can include: stages, video walls, barriers,
lighting and special effect towers, TV and sound towers, platforms
and masts, loud speaker stacks etc. Where temporary
structures are required the Production must:
Select contractors from the vetted list where
necessary for BBC.
Request safety documentation on the following
topics as a minimum for each structure:
- Designers Statement
- Construction Drawings
- Safety Method Statement
- Risk Assessment
- Completion Certificate
Submit relevant documentation to the
Local Authority at least 14 days before the
event.
Ensure risk assessments are exchanged between
relevant contractors.
All information should be retained in the event
safety file.
