Building Energy
Pollution Prevention Control Permits
Any BBC premises where the installed combustion
capacity exceeds 20 MW [individually] or where the installed
combustion capacity exceeds 50MW [aggregated] must be covered by a
Pollution Prevention Control [PPC] Permit irrespective of its
operational status. PPC is a regulatory system that employs an
integrated approach to control the environmental impacts of certain
industrial activities through setting a range of requirements that
are legally binding on the operator of the plant.
